Construction tips for building templates

1. When building templates are stacked in the construction site, cutting and open flame welding operations are not allowed. If cutting and welding are necessary, reliable fire fighting measures should be taken. 


2. When the concrete is poured, a dedicated person should be set up to take care of the building formwork. If the sub-formwork is inclined, displaced, locally run, and bulged, tightening measures should be taken in time before construction can continue. 


3. When assembling and disassembling the pre-assembled large formwork, two lifting points should be used for vertical lifting, and four lifting points should be used for horizontal lifting. When installing, correct and install connectors at the same time. It can be unhooked only after the connection is firm. When lifting scattered formwork, the formwork should be placed in the hanging cage to prevent falling and hurting people. 


4. When disassembling the mold, it should be disassembled one by one, and no pieces should be pried or pulled down. Dismantled templates and accessories are strictly prohibited to be thrown away, and must be delivered by a special person, and stacked at the designated location.

 

ZMADTO Plywood Co.Ltd is focus on construction plywood & wood formwork product. Our factory was established in 1993 and covers an area of 240,000 square meters with an average daily output of more 30,000 pcs plywood. Besides, the factory has more than 200 advanced equipment. After years of continuous development, it has become a leading company in the international wood formwork industry and exported to more than 20 countries around the world.